BOZENA 4 has been tested and fulfills Climatic Environmental Requirements AETCP 300
(e.g. Test on Climatic resistance, Wathertightness, Immersion ..) and
Mechanical Environmental Requirements AETCP 400 (e.g. Test on Vibrations),
as well as Test on Transportability.
BOZENA 4 has successfully passed EMC (Electro-Magnetic Compatibility) test on methods
RS-105, CE-03, CE 102, CS 114, 115, 116.
The Manufacturer follows AQAP 2110:2003, ISO 9001 and is holder of NCAGE 1001M.
BOZENA 4 has passed many survivability and performance tests on many kinds of AP mines as well as AT mines:
Croatian Mine Action Centre – October 2002:
- AP blast mines: PMA 1, PMA 2, PMA 3
- AP bounding fragmentation mines: PMR-2A, PROM-1
- AT mine: TMM-1 ( 5,6 kg of TNT)
Ethiopian Mine Action Office - May 06, 2003:
- AP blast mines: PMD-6, PMN
- AT mine: PRB-M3 (6,0 kg TNT / RDX / Aluminum powder )
Poland Army - December 05, 2002:
- AT mine: TM-62P (7 kg of TNT)
Military Technical & Testing Institute (Záhorie, Slovakia) – Oct 2002 – up to now:
- AP fragmentation & bounding mine: PP Mi-Sr II
- AT mines: PT Mi-Ba III (8 kg of TNT), PT Mi-K (4,9 kg TNT)
Turkish Armed Forces – September 06, 2003:
- AP mines: M14, M16
- AT mines: DM 11 (7,0 kg TNT), B turkish type
Sweden, CEN WS12 test – September 2004:
- AP mines: M-49
- AT mines: M-47B
Detonation of AP mine
Detonation of AT mine
The tests have proved B4 capabilities to effectively detonate or destroy all types of AP and
AT mines up to 9 kg TNT charged in various types of the soil and terrain conditions.
Except of mine clearing, B4 proved to be useful tool in the category of mined area preparation
especially in cutting vegetation with trunks up to 19 cm diameter.
Experiences from the B4 tests and from day-to-day operation shoved that depending
on type of mine detonated maximum damage of 5 hammers and 5 chains broken on the
flail unit (working tool) has been recorded and whole system remained fully operational.
Both flail elements are part of the basic set of equipment for the flail and part of
manufacturer’s recommended set of spare parts for respective period of operation.
The tools needed for repair are also part of the basic set of equipment for the flail.
Replacement of one hammer and chain takes about 2 minutes and can be done on site.